OFGS is the proponent for the construction of a single storey, at grade carpark (with 84 car spaces) within the Oxford Falls Grammar School site, at 1078 Oxford Falls Road, Oxford Falls (the site). The proposed building will be located on the western side of the creek, which runs through the site in a north-westerly direction. Access to the carpark is via the existing driveway crossing from Dreadnought Road.
The development has been assessed as a ‘Development Permitted without Consent’ under the State Environmental Planning Policy – Educational Establishments and Child Care Facilities 2017 (the ESEPP).
D.M Planning Pty Ltd has prepared a REF dated 26 March 2021 to assess the potential impacts of the proposed activity. The REF was prepared in accordance with Part 5 of the Environmental Planning and Assessment Act 1979 (EP&A Act), clause 228 of the Environmental Planning and Assessment Regulation 2000 (EP&A Regulation) and the Environmental Assessment Code of Practice for Part 5 Activities, for non-registered schools (the Code).
To allow the proposed activity to proceed, OFGS has made a determination of the REF in accordance with Part 5 of the EPA Act.
The determination for the carpark is available here:
OFGS Decision Statement (carpark)
Please direct any enquiries to:
Oxford Falls Grammar School
C/O Greg Morris
Post: 1078 Oxford Falls Road, Oxford Falls NSW 2100
Email: feedback@ofgs.nsw.edu.au
Phone: (02) 8978 0500
Review of Environmental Factors (REF) – Carpark,– List of supporting Appendices as follows:
Appendix 1 – Permissibility Legal Advice
Appendix 2 – Last Consent issued by Council DA2016/0662
Appendix 4 – Architectural Drawings
Appendix 6 – Preliminary Environmental Site Investigation
Appendix 7 – Arboricultural Impact Assessment
Appendix 8 – Bushfire Assessment Report
Appendix 9 – Civil Engineering Statement
Appendix 10 – Traffic Impact Assessment
Appendix 11 – Biodiversity Assessment
Appendix 12 – Flood Assessment
Appendix 13 – Aboriginal Objects Due Diligence
Appendix 14 – Historical Heritage Constraints Assessment
Appendix 15 – Geotechnical Report
Appendix 16 – Construction Management Plan
Appendix 17 – Sustainability report